The project comprises three stages for the modernization of the animal shelter for homeless animals in Warsaw:
STAGE 1 – construction of a new Geriatric Building. This facility will provide 24-hour care for approximately 70 homeless dogs, with a medical section— veterinary and treatment rooms—connected to the existing general hospital building for dogs.
STAGE 2 – construction of a new wing for the administration building.
STAGE 3 – reconstruction of the existing section of the administration building, which serves as office space with a veterinary area.
Animal Shelter Architecture
Designing a facility for unique users — animals, specifically senior animals in a geriatric part — is a challenge. The project required close collaboration with those who care for the animals and understand their needs.
The geriatric building is easily accessible from various parts of the shelter, thanks to a layout featuring two entrances equipped with locks (vestibules) on the south and north sides. In the eastern section, we placed enclosures for senior dogs, connected with outdoor, fenced and partially roofed areas.
The building’s exterior form is a direct reflection of its internal functions. The ground floor and the upper level are clearly distinguished within the block, further emphasized by a contrasting treatment of the façade. We opted for a subdued color palette, harmonized with the existing shelter buildings. The arrangement of glazing on the façade follows a modular logic, which also serves to indicate the building’s functions: large windows – veterinary offices and dog enclosures, smaller windows – auxiliary spaces. The roofed dog enclosures stand out in the foreground.
Design for Deconstruction (DfD)
The Geriatrics Building was designed in the spirit of a circular economy. The facility can be dismantled and relocated elsewhere. Its primary structure consists of a lightweight steel frame, with the number of different structural component types kept to a minimum. Connections between the steel elements are reversible—utilizing bolted joints. The external insulated walls, partition walls, and parts of the roof are constructed from sandwich panels—prefabricated elements ready for on-site assembly according to specific system guidelines. Furthermore, the foundation were minimized through the use of prefabricated road slabs, with cast-in-place concrete foundations – only in a limited section. Due to the need to design for deconstruction, we established an organized structure, a modular division, and functional zoning. It is worth noting that the use of prefabricated components streamlines the construction process, reduces waste generation and energy consumption on the construction site.
Eco-friendly solutions
Importantly, the project also involves transitioning the heating systems for all facilities on the shelter grounds from oil-fired boilers to efficient, eco-friendly heat pumps. We have proposed the installation of photovoltaic panels on the Geriatrics building and the existing pavilions for dogs. The panels will cover a significant portion of the shelter’s electricity demand. The newly designed Administration building will be equipped with solar thermal collectors for water heating.
Most of the roof area will be covered with extensive greenery, which retains rainwater. Furthermore, we have designed underground rainwater storage tanks. This harvested rainwater can be used for cleaning outdoor dog enclosures, as well as for watering the grass and vegetation in the dog exercise areas near the buildings.
The project was on display as part of the “Plans for the Future | LAB” exhibition at ZODIAK Warsaw Pavilion of Architecture. See our concept for pavilions in the Botanical Garden, which was also featured in the exhibition.


